Milestone 1.1.1 (Edinburgh)

10 months late (1/15/2009)

100%

Closed tickets:
10
Active tickets:
0
Build system

1/1

Default File Adaptor

1/1

Default Replica Adaptor

1/1

Default Stream Adaptor

2/2

GridFTP File Adaptor

1/1

SAGA Engine

4/4

This milestone contains issues that have to be solved before the summer school!

http://www.nesc.ac.uk/esi/events/945/

Note: See TracRoadmap for help on using the roadmap.